---
analysis-role: guide
analysis-category: guide
companion-eligible: true
confidence-level: medium
confidence-rationale: The guide compares the linked primary records. Physical interpretations depend on the observations and limits specified in each case.
evidence-status: mixed
ai-analysis: true
ai-generated: true
accuracy-disclaimer: AI-assisted analysis. Verify interpretations against the linked original records.
seo-title: "Inside the Contract File — AAWSAP deliverables and the special-access request"
seo-description: "Compare what DIA commissioned, what BAASS reported, how reviewers judged the papers and what became of Senator Reid’s request for special access."
topic-slug: aawsap-contract-deliverables-and-access-review
topic-title: "Inside the Contract File — AAWSAP deliverables and the special-access request"
topic-description: "Compare what DIA commissioned, what BAASS reported, how reviewers judged the papers and what became of Senator Reid’s request for special access."
topic-audience: serious-uap-readers
topic-priority: 8
guide-description: "Compare what DIA commissioned, what BAASS reported, how reviewers judged the papers and what became of Senator Reid’s request for special access."
---

# Inside the Contract File — AAWSAP deliverables and the special-access request

![The two stacks of paper represent the contractor’s report and the government’s reviews.](/media/Release_8/Analysis/images/baass-contract-review.png)

*AI interpretive reconstruction · not source evidence · uaps.world. The two stacks of paper represent the contractor’s report and the government’s reviews.*

The strongest documentary comparison is between Senator Reid’s June 2009 request for restricted access and DIA’s November response. Reid described findings he considered sensitive. DIA found insufficient grounds for the proposed protection. Between those documents sits a favorable October review of technical papers. Each answers a different question about the same contract. [Reid’s letter](/?open=Release_8%2FDOW-UAP-D183-Correspondence_from_Senator_Harry_Reid_June_24-2009.pdf) · [Review of deliverables](/?open=Release_8%2FDOW-UAP-D188-Review_of_AAWSAP_Contract_Deliverables_October-2009.pdf&page=1) · [DIA’s access review](/?open=Release_8%2FDOW-UAP-D185-Review_of_AAWSAP_Special_Access_Program_Request_November-2009.pdf&page=1).

## Sources

| Stage | What to open | What the record establishes |
| --- | --- | --- |
| Commission | [August 2008 statement of work](/?open=Release_8%2FDOW-UAP-D182-AAWSAP_Statement_of_Work_August-2008.pdf) | DIA set a long horizon for assessing aerospace developments and specified twelve technical areas, reporting requirements and an integrated assessment. A research topic establishes the scope of an assignment. |
| Brief leadership | [January talking paper](/?open=Release_8%2FDOW-UAP-D187-DIA_Talking_Paper_for_Senator_Reid_Engagement_January-2009.pdf) and [May talking paper](/?open=Release_8%2FDOW-UAP-D184-AAWSAP_Talking_Paper_for_Senator_Reid_Engagement_May-2009.pdf) | These documents prepared DIA leadership for possible discussions with Reid. Their audience helps explain what they compress into a few status points. |
| Describe the work | [July ten-month report, contents](/?open=Release_8%2FDOW-UAP-D172-BAASS_Ten_Month_Report_July-2009.pdf&page=5) | BAASS put investigations, database work, project progress and a strategic plan in one volume. The table of contents lets a reader tell a retrospective section from a plan before interpreting an individual passage. |
| Review the papers | [October review memo](/?open=Release_8%2FDOW-UAP-D188-Review_of_AAWSAP_Contract_Deliverables_October-2009.pdf&page=1) and [list of first-year reports](/?open=Release_8%2FDOW-UAP-D188-Review_of_AAWSAP_Contract_Deliverables_October-2009.pdf&page=3) | DIA listed 26 delivered papers. The memo distinguishes eight reviews by other authors on the list from five by outside reviewers. Its positive judgments concern those research papers. |
| Assess protection and value | [November access review](/?open=Release_8%2FDOW-UAP-D185-Review_of_AAWSAP_Special_Access_Program_Request_November-2009.pdf&page=1) and [December 2010 retrospective](/?open=Release_8%2FDOW-UAP-D186-DIA_Information_Memorandum_on_AATIP_AAWSAP_December-2010.pdf) | DIA described unclassified first-year products and insufficient grounds for the requested restrictions. The later memo counted 26 initial reports and twelve additional reports and discussed the program’s limited value to DIA. |

## Working Assessment

A technical paper can competently describe a research frontier while offering limited help with a particular intelligence mission. The October authors evaluated the quality of the work. The later memorandum asked what DIA gained from sponsoring it. Extending the favorable reviews to every field account in the 538-page BAASS volume would silently change the material under review. [October review](/?open=Release_8%2FDOW-UAP-D188-Review_of_AAWSAP_Contract_Deliverables_October-2009.pdf&page=1) · [BAASS contents](/?open=Release_8%2FDOW-UAP-D172-BAASS_Ten_Month_Report_July-2009.pdf&page=5) · [DIA retrospective](/?open=Release_8%2FDOW-UAP-D186-DIA_Information_Memorandum_on_AATIP_AAWSAP_December-2010.pdf).

To follow a sensitive-finding claim, begin with [Reid’s own wording](/?open=Release_8%2FDOW-UAP-D183-Correspondence_from_Senator_Harry_Reid_June_24-2009.pdf), identify the specific deliverable it might refer to, then look for its measurements, review and custody history. A matching restricted annex and independent technical evaluation would strengthen that connection. A study addressing only theoretical feasibility leaves it open. The [earlier BAASS fieldwork companion](/?open=Release_7%2FAnalysis%2FC135-AAWSAP-BAASS-Plans-Fieldwork-and-Capability-Claims.md) follows the monthly reports that surround the ten-month volume.

[Return to the Release 8 reading map](/?open=Release_8%2FAnalysis%2FC138-Release-8-Companion-Map-and-Reading-Guide.md)
